We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Concrete Construction Method.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Concrete Construction Method - List of Manufacturers, Suppliers, Companies and Products

Concrete Construction Method Product List

1~4 item / All 4 items

Displayed results

Sprayed Porous Concrete Method

Effective for drainage, permeability, and greening! High-performance slope protection method.

The "Sprayed Porous Concrete Method" uses a honeycomb-shaped flexible formwork (TerraCell) to spray porous concrete inside the formwork. This method forms a permeable, porous concrete that allows drainage across all cross-sections, preventing the retention of groundwater and suppressing the accumulation of spring water, thereby preventing loosening and collapse of the construction surface. When planting vegetation, it allows for easy greening promotion without hindering the establishment of the vegetation substrate. 【Features】 ■ Balances slope protection work and greening work ■ Vegetation is maintained over the long term ■ Lightweight and flexible, providing good workability ■ Allows drainage of water to the back across the entire slope ■ Controls the height of plants, reducing maintenance costs such as mowing *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor construction: Re-vibration and high-density concrete method

High-density 200-year concrete, highly regarded for factories, warehouses, logistics facilities, and roads.

The re-vibration and high-density concrete method removes voids and water paths that cause cracking, utilizing the compaction effect of re-vibration to form a dense structure within the concrete and improve its density. It aims to enhance durability, wear resistance, and impact resistance, delay carbonation, suppress cracking, and shorten construction time through simultaneous execution, thereby extending the service life for various infrastructure developments such as factories, warehouses, logistics facilities, and roads, in line with national resilience policies. 【Features】 ○ Extended service life ○ Significant crack suppression ○ Reduction in construction man-hours ○ Increased asset value ○ Total cost reduction For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Vacuum concrete construction method

Improved durability and shortened construction time through excess water removal! Vacuum concrete method.

The vacuum concrete method is a technique for removing excess water (extra water) and entrained air (air contained in fresh concrete) from within the concrete. This method primarily consists of a vacuum mat and a vacuum pump, and it is applied immediately after pouring. 【Features】 ○ Increased durability ○ Significant crack reduction ○ Freeze prevention ○ Reduced work time For more details, please contact us or download the catalog.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Example: Musashino Foods Co., Ltd. Kamus No. 1 Factory

Design to construct a single roof that combines the high ceiling of the second-floor manufacturing area with the low ceiling of the office welfare area.

We would like to introduce a case study of Musashino Foods Co., Ltd., for which we undertook the design. As a solution for the production lines of bread crumbs and sliced bread, a multi-story (3-story) manufacturing plant was constructed. To support the loads from the mixers on the second floor and to achieve a 15-meter span, we adopted the prestressed concrete (post-tension) method. The distinctive arched roof shape is designed to create a single roof that accommodates the high ceiling of the second-floor manufacturing area and the lower ceiling of the office and welfare area. 【Overview】 ■ Location: Arashiyama, Hiki District, Saitama Prefecture ■ Construction - Architecture: Toda Corporation - Equipment: Daidan ■ Total Floor Area: 11,000 m² ■ Structure and Scale: SRC construction, 3 stories above ground *For more details, please refer to the PDF document or feel free to contact us.

  • Food Factory Equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration